Northwood Park, Santry, Dublin


Stroma was appointed to carry out a series of site inspections, all supported with illustrated reports, designed to monitor the implementation of the air barrier on a floor by floor basis.




Air Tightness Testing in Ireland

With an air tightness target of 7 m3/( @50Pa, attention to detailing and the specification of robust materials within the air barrier was given due care.  When testing of the building took place, the building achieved a figure of 6.39 m3/( @50Pa.


Northwood Park case study – download