Health and Safety Services >>
As experts in air tightness compliance, Stroma Tech is helping clients to understand the impact of the Part L 2013 air tightness parameters, and what this means for their projects.
The Part L 2013 stipulations for air tightness permit a maximum air tightness test result at 10 m3/(m2.hr)@50Pa. However, there are a number of subtler factors to consider – all underpinned by the need for a further reduction in CO2 emissions, and the move towards zero carbon dwellings by 2016 – which will make lower design air permeability inevitable for the majority of projects.
Stroma Tech are leading experts in air tightness and wider Part L compliance, and provide a range of consultancy and testing services to assist clients in interpreting and meeting air tightness targets. For further information, please contact us on 0845 621 22 22 or comply@stroma.com, or explore the links below: